Country guide in progress — the full narrative guide ships as part of the cornerstone content.
-
Denmark · Operational (expansion frozen) UNVERIFIED
730 reported by tracker — UNVERIFIED; likely grid/substation capacity not IT load
-
Denmark · Operational
50 (reported)
-
Denmark · Operational + expanding UNVERIFIED
UNVERIFIED (€600m investment reported)
-
Denmark · Operational (opened per Microsoft announcement) UNVERIFIED
UNVERIFIED IT capacity; 130 MW renewable PPA portfolio
-
Denmark · Planned / under development UNVERIFIED
UNVERIFIED
-
Denmark · Operational (DEN01); expansion planned UNVERIFIED
~30 MW Copenhagen campus planned; portfolio pages cite 30–250 MW Copenhagen/Varde (UNVERIFIED)
-
Denmark · Campus development — not yet at end-state capacity
Designed for 72 MW end-state critical capacity across two buildings (48 MW + 24 MW), 25 acres. Current built/operational capacity not published.
-
Denmark · Operational
1.2 MW IT load, ~4,600 m² white space across three floors (Denmark page) vs 800 kW (Nordic region page) — Vaultica's own site gives two different figures for this site; both shown, neither picked. See the Vaultica assessment for this as a recurring pattern, not an isolated error.
-
Denmark · Announced / pipeline UNVERIFIED
UNVERIFIED (part of >400 MW combined atNorth/Bulk/Prime pipeline)