Green Mountain — TEL-Rjukan (Telemark)
Right of reply sent 21 August 2026, deadline 4 September 2026. Green Mountain responded on 27 August 2026. The operator answered our questions but did not submit a separate statement for publication; their answers are reflected in the text below.
Norway · Operational + expanding
| Status | Operational + expanding |
|---|---|
| Capacity (MW) | 50 MW total site capacity, 29,000 m² (operator-published) Sources: greenmountain.no |
| Power source claim | Hydropower (Rjukan hydro heritage). Heat reuse: Hima Seafood, land-based trout farming -- IN OPERATION, confirmed by Green Mountain in response to our questions, August 2026: waste heat is transferred through a closed pipe system to Hima Seafood's land-based aquaculture facility and used to raise water temperature. 1.75 MW confirmed as the current delivered figure. A potential scale-up to 8 MW is UNDER EVALUATION WITH NO FIXED TIMELINE for phase two -- not a scheduled expansion. Officially opened by Norway's Minister of Digitalisation and Public Governance. This is Green Mountain's only active heat-reuse project following the end of the Norwegian Lobster Farm collaboration at SVG-Rennesøy. Sources: greenmountain.no |
| Published PUE | 1.08–1.20 (average range, operator-published per-site figure) Sources: greenmountain.no |
| Ownership / jurisdiction | Azrieli Group, Israel (100% owner since 2021). Managing Director Nordics: Truls Dishington (since 22 May 2026). Sources: baxtel.com · greenmountain.no |
| AI / GPU relevance | Colocation; suitable for HPC densities (operator claim, unverified) |
| Verification notes | Grade A -- named offtaker, quantified volume, operator-confirmed as currently in operation via right of reply (Aug 2026). The 8 MW figure carries no grade: it is under evaluation with no timeline, so there is no committed figure to assess. Green Mountain confirms the 2025 Sustainability Report is self-reported and that PUE and emissions data are NOT third-party audited; it is prepared with reference to the ESRS framework. Right of reply sent 21 Aug 2026; ANSWERED by Green Mountain 27 Aug 2026, within the window. The operator answered our questions but did not submit a separate statement for publication. |
Fields marked UNVERIFIED could not be confirmed against a public source. We publish uncertain data as uncertain.